Pre-Shipment Inspection of Shisha Charcoal: Briefing Your Inspector and Timing the Visit

This guide is part of the quality section, where the factory's quality data is gathered, and is written for a buyer who sends an inspector to check shisha charcoal, the hookah charcoal or hookah coals of US and Canadian buyers, before it ships. It is also written for that inspector. The rule is short: inspectors are welcome, and the factory pays.

Written by
Henry Sinaga
Reviewed by
Dimas Setyawan,
Updated
Reading time
6 min read
A container is inspected empty — dry, clean, odor-free and without holes — before charcoal is loaded.

Quick answer

Can I send my own inspector before shipment, what should they check, and when?

Buyers' third-party inspectors are welcome before shipment, the factory pays for the pre-shipment inspection, and an independent surveyor also inspects the load. Book the visit for the days between packing and stuffing; on a first order that is before the balance is due. Brief the inspector on the size tolerance, the grade, the cartons and the packing-day record of your shisha charcoal.

1. What a pre-shipment inspection is

A pre-shipment inspection is your check, by your inspector, before the container leaves.

Definition

pre-shipment inspection

A pre-shipment inspection is a check of finished goods at the factory, by an inspector the buyer appoints, after production and before the container is loaded or sealed, against the specification on the order.

The rule on file is one sentence: Buyers' third-party inspectors are welcome before shipment; the factory pays for the pre-shipment inspection.

Three checks are easily confused, and only the first is yours to instruct:

  • Your inspector. Appointed and briefed by you, reporting to you.
  • The independent surveyor. An independent surveyor inspects the load before shipment; the factory pays, inside the FOB price.
  • A live video call. Live video audits and factory visits are welcome.

The inspection is one of several ways to check this supplier. The verification page lists the other checks you can run on us, under factory verification.

2. When to book the visit

What an inspector can see depends on the stage the order has reached.

Stages of a container order of coconut shell charcoal briquettes at this factory, what an inspector can see at each, and what fixes its timing; times as confirmed by the owner in November 2026.
StageWhat can be inspectedWhat fixes the timing
Production The line and the pieces as they are formed and dried21 days for a 20 ft container, 21–25 days for a 40 ft
Weathering The yard and the racks14 days after production, before packing
Packing The packed cartons and the temperature recordThe charcoal is packed at 40 °C or less, and the temperature is written down
Stuffing The empty container and the loadThe day the container is at the factory

Stuffing day has its own page: what happens on stuffing day, which the inspection fits around, under container stuffing. The stage before packing is weathering, the period the carriage conditions set.

The order's stage is reported to you: the factory sends weekly updates on production, packaging, QC and stuffing, by WhatsApp every Monday. On a first order the terms are a 50% deposit, with the balance before stuffing, so the packed goods are inspected before that balance. Tell the export desk at the deposit that an inspector will come.

Weathering is the period finished charcoal briquettes spend under cover in the open air before packing; special provision 978 sets at least 14 days.

3. What to brief your inspector to check

An inspector can only check against a reference, and each reference below is on file.

Checks a buyer's inspector can make on a container of coconut shell charcoal briquettes at this factory, the reference on file for each, and the page that sets it out; references as confirmed by the owner in November 2026.
CheckAgainst whatWhere it is set out
Dimensions The stated size tolerance: ±0.3 mm per sideSize consistency
Grade The ash range of the grade on your proforma invoice; your own laboratory can give you a figure Grades and specifications
Appearance and burn The sample you approved, which the factory keeps Sample to container
Count and weight The nominal pieces per kg of the size, and the packing list Pieces per kg and net weight
Cartons, boxes and marks The packaging written on your proforma invoice Packaging
Temperature and dates The record of the container: date of production, date of packing and temperature on the day of packing UN 1361: how we comply
Empty container and headspace The empty container is checked and photographed before loading; 30 cm of headspace is left above the load Container preparation and stuffing

The specification, the packaging and the volume of your order are on the proforma invoice, and the size reference is the stated size tolerance. A check with no reference on file is not listed.

Special provision 978 sets carriage conditions for UN 1361 charcoal; it is not an exemption. Unless the competent authority approves otherwise, the material is weathered under cover for at least 14 days before packing (or steam-treated and packed under inert gas), packed at no more than 40 °C, and stowed with at least 30 cm of headspace, and the dangerous goods document states the production date, packing date and packing temperature.

Source: Resolution MSC.556(108): Amendments to the IMDG Code, special provision 978 and 5.4.1.5.18 (opens in new tab), International Maritime Organization (IMO), accessed

4. What the factory puts in front of the inspector

The factory can put four things in front of an inspector, and each is a confirmed fact.

  • The record of the container: date of production, date of packing and temperature on the day of packing.
  • The approved sample: the approved sample is kept so reorders can be matched to the previous order. It is the reference under golden sample.
  • The retained sample: a sample of every batch, about 25 kg of each batch, kept for 5 years.
  • The criteria that fail a batch: smell or smoke on warming up, high ash, cracks or breakage and inconsistent size or density.
A retained sample is a labeled portion of a production batch that the maker keeps after the goods ship, so a later question can be checked against it.
  • Notice: 3 working days before the inspector arrives.
  • Sampling plan: no fixed plan of the factory's own; the buyer's plan is accepted.

Note

Not on file yet

  • Whether an inspector may take samples away.

Ask the export desk about this point before the visit, and have the answer in writing.

5. Getting to the factory

One airport and one road time are on file for reaching the factory.

  • The airport: an inspector flies to Yogyakarta International Airport (YIA); the factory is 2 hours from it by road.
  • The address: Jl. Magelang–Purworejo Km 11, Jambu, Punduhsari, Tempuran, Magelang Regency, Central Java 56161, Indonesia.
  • The closed days: national public holidays and collective leave (cuti bersama).

Agree the date with the export desk before the flight is booked. What a visit covers, in person or on a call, is on the video audit and visits page.

6. If the inspection finds a problem

A finding is handled differently before the container ships and after it arrives.

Before shipment, a finding leads to a change in the order, and the rule for a change is on file: changes after the deposit are confirmed with the buyer before they take effect. The rule is set out on the changes and cancellations page.

After arrival, the claim windows apply: 7 days for a shortage and 14 days for a quality problem, counted from the arrival of the container at the buyer's warehouse. They are on the claims and remedies page.

Note

A failed check

A batch that fails your inspector's check is reworked, then inspected a second time before it ships. Agree the date of the second inspection with the export desk.

How facts on this page are confirmed is set out in the editorial and review policy.

Questions buyers ask

Who pays for the pre-shipment inspection?
The factory does. Buyers' third-party inspectors are welcome before shipment; the factory pays for the pre-shipment inspection. Separately, an independent surveyor inspects the load before shipment, and the factory pays for that inside the FOB price. You choose and instruct your own inspector.
Should I inspect before or after I pay the balance?
On a first order, before. The first-order terms are a 50% deposit, with the balance before stuffing, so the inspection of the packed goods is the check you hold before that payment. For a repeat buyer the balance follows arrival, and the inspection is one check among several.
Can the inspection be done by video instead?
A live video call is welcome and shows the line, the yard and the packed cartons. It cannot take a measurement or draw a sample for you, so it complements an inspector and does not replace one. Ask the export desk to time the call against the stage your order has reached.