Skip to content
PT SCBI

Overview

How to Order Shisha Charcoal by the Container: Eight Steps, Order by Order

This section starts from the home page and is for a buyer ready to run an order of shisha charcoal, the hookah charcoal or hookah coals of US and Canadian importers. It gives the eight steps of a container order, the time each takes and what you send at each one. Each container is ordered on its own, from a minimum of 1 ocean container.

Written by
Henry Sinaga
Reviewed by
Dimas Setyawan,
Updated
Reading time
4 min read
A request for quotation for shisha charcoal states shape, grade, packaging, container size and destination port.

Quick answer

How does a container order of shisha charcoal run from first contact to loading?

A container order runs in eight steps from RFQ and sample to loading and documents, order by order, with no supply contract required. Each step links the page that owns it: the sample, the proforma invoice and its payment terms, lead times with the weathering window inside them, and the documents. Send the section 2 fields and the first quote for coconut shell charcoal briquettes is one you can compare.

In this section

  1. Your First Container of Shisha Charcoal: Sample to Arrival, Step by Step, and What to Set Up on Your Side

    A first container runs from sample and quote through verification, deposit, production, balance and loading to documents, with the buyer's input named at each step.

  2. Payment Terms and Our Proforma Invoice: Every Field, the Deposit, the Balance and the Bank-Name Rule

    The factory's proforma invoice fixes specification, quantity, price, incoterm, loading date and payment terms, and names one bank account in its registered name.

  3. Incoterms for Shisha Charcoal: EXW, FOB, CFR and CIF, and Where the Dangerous-Goods Work Sits

    The incoterm decides who books the vessel; weathering, packing checks and the dangerous-goods declaration stay with the factory under FOB, CFR and CIF.

  4. Mixed Containers of Shisha Charcoal: The Minimum per Variant, the Load and the Paperwork

    One container can carry several shapes, sizes, grades and packaging formats, provided each variant meets the minimum per variant and has its own invoice line.

  5. After the Deposit: The Weekly Updates on a Shisha Charcoal Order, Stage by Stage

    After the deposit, the factory sends a weekly update on production, packaging, QC and stuffing, so a missed week is a reason to ask.

  6. Shisha Charcoal Order Documents: What You Receive at Each Stage, From Proforma Invoice to Bill of Lading

    Documents arrive in the order the shipment creates them: proforma invoice first, loading documents before departure, bill of lading after the vessel sails.

  7. Reordering Shisha Charcoal: What Is Already on File, Payment Terms and What Can Change

    A reorder is matched to the approved sample kept from your previous order; repeat buyers pay a 10% deposit and the balance after arrival.

  8. Switching Shisha Charcoal Suppliers or Adding a Second Source: How We Requalify Your Spec

    A switch runs on measured values, not grade names: your current spec is mapped to ours, matched on a sample, then proven on one container.

  9. Changes and Cancellations: How a Container Order Can Change After the Deposit

    After the deposit, a change to a container order takes effect only once the factory has confirmed it with the buyer.

1. The eight steps of an order

An order runs in eight steps, and each one has a page that sets out its detail.

Definition

container order

A container order is a single purchase of coconut shell charcoal briquettes in one 20 ft or 40 ft sea container, run from request for quotation and sample through proforma invoice, deposit, production, loading and balance payment.

  1. Step 1

    Send your request for quotation

    Market, product, container. Name your destination port, the shape and size, the grade, the packaging and the container size (20 ft or 40 ft). The quote comes back dated, on EXW, FOB, CFR or CIF terms, and holds for 5 working days.

    The request-for-quotation checklist

  2. Step 2

    Test a sample

    Before any deposit. Burn, measure and drop-test the candidate grade on your own equipment, the way your customers will use it.

    Start with a 1 kg sample

  3. Step 3

    Confirm the specification

    The approved sample. Your written approval of the sample fixes the specification the container is made to.

    What a golden sample is

  4. Step 4

    Receive the proforma invoice

    The order record. It states the full specification, the packaging and the volume, the price and incoterm, and the payment terms, in the factory's registered name.

    Payment terms and what the proforma invoice contains

  5. Step 5

    Pay the deposit

    To the company account. On a first order the terms are a 50% deposit, with the balance before stuffing. Pay only to the account named on the proforma invoice, held in the company's registered name.

    Check the bank name before you pay

  6. Step 6

    Production and weathering

    Pressed, dried, rested. The order is pressed and dried, then weathered for 14 days before packing, because charcoal is carried by sea as a dangerous good.

    Lead times and the log of past orders

  7. Step 7

    Pay the balance

    On the proforma terms. The balance falls due at the point the proforma invoice states, set out in step 5 for a first order. Buyers' third-party inspectors are welcome before shipment; the factory pays for the pre-shipment inspection, so this is the moment for your own inspection.

  8. Step 8

    Stuffing, loading and documents

    The container sails. The container is stuffed, sealed and taken to the port, and the export documents are issued for it.

    The documents you receive with every container

A repeat buyer's balance falls later, after arrival, as section 4 explains. How facts on these pages are confirmed is set out in the editorial and review policy.

2. What we need from you at each step

An order waits whenever an input is missing, so this table lists what you send at each step.

What the buyer sends at each step of a container order of shisha charcoal, and why it is needed at that point.
StepWhat you sendWhy
Request for quotation Destination port, shape and size, grade, packaging, container size and incotermThe quote is dated and priced for exactly that basis
Sample A courier address; the courier is DHL or EMS, paid by the buyerThe parcel leaves once the address and courier are settled
Specification Written approval of the sampleThe approved sample is the reference the container is checked against
Packaging Artwork files, if the boxes carry your brand: vector files (Illustrator preferred), CMYK plus PantonePrinting starts only from approved artwork
Deposit and balance A copy of each remittanceEach payment is matched to its step on the proforma invoice
Inspection Your inspector's name and date, if you appoint oneThe inspection is planned around the loading date
Bill of lading Consignee and notify-party detailsThe shipping documents are issued in those names
A sample approved in writing is the reference a container order of shisha charcoal is checked against.

Tip

One message, every field

Send the request with all the fields from the request-for-quotation checklist on the contact page. A field that is missing is asked for before the quote, which costs a day.

3. How long it takes

Lead time is set by production, the weathering window and the way to the port, and the table gives each stage as the factory states it.

Lead time by stage for one container of coconut shell charcoal briquettes, as stated by the factory; stages are listed, not added up.
StageTime
Production, one 20 ft container 21 days
Production, one 40 ft container 21–25 days
Weathering before packing 14 days
From packing to on board 14 days
Printed boxes, new design 2 weeks
Printed boxes, existing design about 2 weeks
Freshly produced charcoal is weathered before packing because fresh carbon can self-heat; IMDG Code special provision 978 names weathering as a carriage condition for UN 1361 charcoal.

Demand peaks before Ramadan and the summer shisha season, so confirm an order for those months 6–8 weeks earlier than usual. Production stops for Idul Fitri (Lebaran) and national public holidays, with dates set by the factory for Idul Fitri and by the government decree (SKB 3 Menteri) for national public holidays, each year.

The full record is in lead times and the log of past orders. The order-by dates for your port are on the order calendar, the closures on the holiday and production calendar, and sea transit on the transit page. How production slots are allocated in the peak months is on the capacity and production planning page.

4. After the first container: reorders and switching

A reorder starts from the specification already approved, and a buyer switching suppliers starts from the product it buys today.

A reorder can reuse the approved specification and packaging, so it can go straight to the proforma invoice. The terms change too: a repeat buyer pays a 10% deposit, with the balance after arrival. How reorders run is set out on the reorders page, and changes during an order on the changes and cancellations page.

A buyer replacing another supplier sends its current specification or COA. The product is matched from the buyer's current COA: a matching sample ships within 3 days, then the buyer orders the first container. The steps are on switching suppliers and adding a second source, where the second-source supplier case is covered too.

Questions buyers ask

Do you require a supply contract or an annual commitment?
No. Each container can be ordered on its own, on its own proforma invoice, and no supply contract is required. Buyers who want reserved capacity can ask for a repeat program instead; it is offered, never a condition of ordering. In the busy months production slots go to orders in the order they are confirmed, which is why the season matters.
What happens after I send a request for quotation?
The export desk replies within 15 minutes during working hours (WIB), or the next working day outside them. The quote states availability, lead time and a dated FOB price for the shape, grade, packaging and destination port you named. If a detail is missing from your RFQ it is asked for before quoting, so the first quote is one you can compare.
Who at the factory handles my order?
The Export Sales Manager, Irfan Maulana, from the first message to the release of documents. Production, quality and loading are factory departments; the export desk is your one contact and relays their dates and records.

Plan your next container

Send market, container size and target arrival date — we reply with the loading date and the order-by deadline.