Quick answer
How does a container order of shisha charcoal run from first contact to loading?
A container order runs in eight steps from RFQ and sample to loading and documents, order by order, with no supply contract required. Each step links the page that owns it: the sample, the proforma invoice and its payment terms, lead times with the weathering window inside them, and the documents. Send the section 2 fields and the first quote for coconut shell charcoal briquettes is one you can compare.
In this section
-
Your First Container of Shisha Charcoal: Sample to Arrival, Step by Step, and What to Set Up on Your Side
A first container runs from sample and quote through verification, deposit, production, balance and loading to documents, with the buyer's input named at each step.
-
Payment Terms and Our Proforma Invoice: Every Field, the Deposit, the Balance and the Bank-Name Rule
The factory's proforma invoice fixes specification, quantity, price, incoterm, loading date and payment terms, and names one bank account in its registered name.
-
Incoterms for Shisha Charcoal: EXW, FOB, CFR and CIF, and Where the Dangerous-Goods Work Sits
The incoterm decides who books the vessel; weathering, packing checks and the dangerous-goods declaration stay with the factory under FOB, CFR and CIF.
-
Mixed Containers of Shisha Charcoal: The Minimum per Variant, the Load and the Paperwork
One container can carry several shapes, sizes, grades and packaging formats, provided each variant meets the minimum per variant and has its own invoice line.
-
After the Deposit: The Weekly Updates on a Shisha Charcoal Order, Stage by Stage
After the deposit, the factory sends a weekly update on production, packaging, QC and stuffing, so a missed week is a reason to ask.
-
Shisha Charcoal Order Documents: What You Receive at Each Stage, From Proforma Invoice to Bill of Lading
Documents arrive in the order the shipment creates them: proforma invoice first, loading documents before departure, bill of lading after the vessel sails.
-
Reordering Shisha Charcoal: What Is Already on File, Payment Terms and What Can Change
A reorder is matched to the approved sample kept from your previous order; repeat buyers pay a 10% deposit and the balance after arrival.
-
Switching Shisha Charcoal Suppliers or Adding a Second Source: How We Requalify Your Spec
A switch runs on measured values, not grade names: your current spec is mapped to ours, matched on a sample, then proven on one container.
-
Changes and Cancellations: How a Container Order Can Change After the Deposit
After the deposit, a change to a container order takes effect only once the factory has confirmed it with the buyer.
1. The eight steps of an order
An order runs in eight steps, and each one has a page that sets out its detail.
Definition
container order
A container order is a single purchase of coconut shell charcoal briquettes in one 20 ft or 40 ft sea container, run from request for quotation and sample through proforma invoice, deposit, production, loading and balance payment.
-
Step 1
Send your request for quotation
Market, product, container. Name your destination port, the shape and size, the grade, the packaging and the container size (20 ft or 40 ft). The quote comes back dated, on EXW, FOB, CFR or CIF terms, and holds for 5 working days.
-
Step 2
Test a sample
Before any deposit. Burn, measure and drop-test the candidate grade on your own equipment, the way your customers will use it.
-
Step 3
Confirm the specification
The approved sample. Your written approval of the sample fixes the specification the container is made to.
-
Step 4
Receive the proforma invoice
The order record. It states the full specification, the packaging and the volume, the price and incoterm, and the payment terms, in the factory's registered name.
-
Step 5
Pay the deposit
To the company account. On a first order the terms are a 50% deposit, with the balance before stuffing. Pay only to the account named on the proforma invoice, held in the company's registered name.
-
Step 6
Production and weathering
Pressed, dried, rested. The order is pressed and dried, then weathered for 14 days before packing, because charcoal is carried by sea as a dangerous good.
Lead times and the log of past orders
-
Step 7
Pay the balance
On the proforma terms. The balance falls due at the point the proforma invoice states, set out in step 5 for a first order. Buyers' third-party inspectors are welcome before shipment; the factory pays for the pre-shipment inspection, so this is the moment for your own inspection.
-
Step 8
Stuffing, loading and documents
The container sails. The container is stuffed, sealed and taken to the port, and the export documents are issued for it.
A repeat buyer's balance falls later, after arrival, as section 4 explains. How facts on these pages are confirmed is set out in the editorial and review policy.
2. What we need from you at each step
An order waits whenever an input is missing, so this table lists what you send at each step.
| Step | What you send | Why |
|---|---|---|
| Request for quotation | Destination port, shape and size, grade, packaging, container size and incoterm | The quote is dated and priced for exactly that basis |
| Sample | A courier address; the courier is DHL or EMS, paid by the buyer | The parcel leaves once the address and courier are settled |
| Specification | Written approval of the sample | The approved sample is the reference the container is checked against |
| Packaging | Artwork files, if the boxes carry your brand: vector files (Illustrator preferred), CMYK plus Pantone | Printing starts only from approved artwork |
| Deposit and balance | A copy of each remittance | Each payment is matched to its step on the proforma invoice |
| Inspection | Your inspector's name and date, if you appoint one | The inspection is planned around the loading date |
| Bill of lading | Consignee and notify-party details | The shipping documents are issued in those names |
Tip
One message, every field
Send the request with all the fields from the request-for-quotation checklist on the contact page. A field that is missing is asked for before the quote, which costs a day.
3. How long it takes
Lead time is set by production, the weathering window and the way to the port, and the table gives each stage as the factory states it.
| Stage | Time |
|---|---|
| Production, one 20 ft container | 21 days |
| Production, one 40 ft container | 21–25 days |
| Weathering before packing | 14 days |
| From packing to on board | 14 days |
| Printed boxes, new design | 2 weeks |
| Printed boxes, existing design | about 2 weeks |
Demand peaks before Ramadan and the summer shisha season, so confirm an order for those months 6–8 weeks earlier than usual. Production stops for Idul Fitri (Lebaran) and national public holidays, with dates set by the factory for Idul Fitri and by the government decree (SKB 3 Menteri) for national public holidays, each year.
The full record is in lead times and the log of past orders. The order-by dates for your port are on the order calendar, the closures on the holiday and production calendar, and sea transit on the transit page. How production slots are allocated in the peak months is on the capacity and production planning page.
4. After the first container: reorders and switching
A reorder starts from the specification already approved, and a buyer switching suppliers starts from the product it buys today.
A reorder can reuse the approved specification and packaging, so it can go straight to the proforma invoice. The terms change too: a repeat buyer pays a 10% deposit, with the balance after arrival. How reorders run is set out on the reorders page, and changes during an order on the changes and cancellations page.
A buyer replacing another supplier sends its current specification or COA. The product is matched from the buyer's current COA: a matching sample ships within 3 days, then the buyer orders the first container. The steps are on switching suppliers and adding a second source, where the second-source supplier case is covered too.