Quick answer
How do I move my shisha charcoal specification to this factory, or run it alongside my current supplier?
A switch runs on measured values, not grade names: your current spec is mapped to ours, matched on a sample, then proven on one container. Verify us first, then send the current spec sheet or COA, a sample of the shisha charcoal you sell and your packaging photos. The mapping places each value against our grades, and one trial container completes the path.
1. Switching, or adding a second source
A switch replaces a supplier under time pressure; a second source adds one on plan. Both run the same path, at different speeds.
Definition
second-source supplier
A second-source supplier is a factory qualified to produce a buyer's existing specification alongside or in place of the current supplier, typically through spec mapping, a matched sample and a trial container.
| Replacing a failed supplier | Adding a second source | |
|---|---|---|
| Time pressure | High: a gap in supply is near | Low: the current supplier still ships |
| What to send | The spec you bought against and what went wrong | The spec you buy against today |
| What to watch | Repeating the shortcut that caused the failure | Two products drifting apart over time |
In both cases the specification is the anchor, and the sample-to-bulk chain is what keeps it: read the sample-to-bulk chain you requalify against before the first sample is sent.
2. Verify us first
A failed supplier was often a supplier nobody checked, so check us before you send anything.
Four checks take less time than a lost deposit: the registry identifiers, the bank name on the proforma invoice, a live video walk-through of production, and your own inspector before loading. They are set out step by step so you can verify us the same way you should have verified them, and they are the factory verification any new supplier should pass.
3. What to send us
The mapping can only answer the problem it is told about, so the transfer pack carries both the specification and what went wrong.
- The current spec sheet or COA, with the laboratory and the date of the report.
- A sample of the product you sell now, so the values can be checked against the product itself.
- Photos of your inner box, carton and marks, if the new supplier is to print them.
- Your market, channel and cadence, for example lounges or retail, and containers per month.
- What failed, and when: the batch, the value that drifted or the loading that was missed.
The old supplier's name is not needed, and we do not ask for it.
4. Mapping your current spec to ours
Grade names are trade names, so the mapping compares your measured values with ours and states where they match, where they differ and whether we can make the product at all.
| Parameter | Your current value | What we compare it with | Result |
|---|---|---|---|
| Ash (%) | From your COA | The grade whose ash band contains it | Match, differs by, or outside |
| Moisture (%) | From your COA | Measured on the matched sample | Compared on your test |
| Fixed carbon (%) | From your COA | Measured on the matched sample | Compared on your test |
| Volatile matter (%) | From your COA | Measured on the matched sample | Compared on your test |
| Calorific value | From your COA, if it states one | Measured on the matched sample | Compared on your test |
| Shape, size and tolerance | From your spec sheet | Our size for the shape, ±0.3 mm per side | Match, or outside what we make |
| Grade | Ash band |
|---|---|
| Platinum | 1.6–1.9% |
| Super Premium | 1.9–2.3% |
| Premium | 2.3–2.5% |
Note
A grade called Platinum at one factory need not be Platinum at another. The values decide; the name follows. How a grade is defined here is on the grades and specifications page.
5. The requalification path
The path proves the match on a sample first and on one container second, and the reference you seal sits between the two.
The path as the factory runs it: matched from the buyer's current COA: a matching sample ships within 3 days, then the buyer orders the first container.
-
Step 1
Send the current spec
COA or spec sheet first. Send the certificate of analysis or spec sheet you buy against today, with the laboratory and date on it, and a sample of the product you sell.
-
Step 2
Read the mapping
Values, not names. We place your ash value in one of our grade bands and list the other values to compare on a matched sample, or say plainly that the specification is outside what we make.
-
Step 3
Test the matched sample
Same record sheet. Run the matched sample through the same test setup and record sheet you use for your current product, so the two results compare line by line.
-
Step 4
Seal a reference
Your counter-sample. Keep part of the approved sample sealed and labeled with its date. It is the reference the first container is checked against on arrival.
-
Step 5
Order the first container
A standard order. The first container is a normal container order on a proforma invoice that states the approved specification, with the factory's standard lead time.
-
Step 6
Reorder on the same spec
One specification. Each reorder quotes the same specification and is checked against the same sealed reference, so container five is compared with container one.
A matched sample proves the batch it came from, not every container after it; the golden sample and the arrival check are what hold the next containers to it. How a sample is requested is on the samples page, and the facts on this page are kept as the editorial and review policy sets out.
6. Running two suppliers, and bridging a gap
Two suppliers on one specification stay comparable when each has its own sealed reference and every arrival is checked the same way.
Keep one spec sheet for both, a separate sealed reference from each supplier, and one arrival check for every container; the size consistency page shows the measurements that check uses. A drift then shows up as a difference against the same sheet, not as a complaint from one market.
In a supply gap, the earliest arrival is the lead time plus the transit to your port. This factory's stated times: production 21 days for a 20 ft container and 21–25 days for a 40 ft, a 14-day weathering hold before packing and 14 days from packing to on board; the lead times page has the detail. Neutral packaging takes the printing step out of a bridge container; printing your own design adds 2 weeks for a new design or about 2 weeks for an existing one.