Skip to content
PT SCBI

Policy · How to order

Changes and Cancellations: How a Container Order Can Change After the Deposit

This page belongs to the ordering section and states the factory's rule for a container order of shisha charcoal, the hookah charcoal or hookah coals of US and Canadian buyers, that changes after the deposit. It covers how a change is confirmed, what it touches and what happens to the deposit on a cancellation. Nothing changes until both sides have confirmed it.

Written by
Henry Sinaga
Reviewed by
Dimas Setyawan,
Updated
Reading time
4 min read

Quick answer

What happens if the specification, the artwork, the quantity or the dates of my order change after the deposit?

After the deposit, a change to a container order takes effect only once the factory has confirmed it with the buyer. The change is recorded on a revised proforma invoice. What it touches depends on the stage a shisha charcoal order has reached: printing, production, weathering or packing. If the buyer cancels, the deposit is returned less the cost of printed packaging and raw material already bought for the order.

1. What this policy covers

This policy covers any change to an order between the deposit and loading.

Definition

order change policy

An order change policy is a factory's written rule for what happens when the specification, packaging, quantity or dates of a container order change after the deposit: who has to confirm the change, how it is recorded, and what follows if the order is canceled.

That means a change to the specification, the artwork, the quantity or mix of variants, the loading date or the consignee details. A quote that has not become an order is outside it: its validity is set out with the proforma invoice on the payment terms page.

A problem found after the container arrives is not a change either. It is a claim, with its own windows, set out on the claims and remedies page.

2. How a change is made and recorded

A change counts once the factory has confirmed it with the buyer and it is on the order record.

The rule is one sentence: changes after the deposit are confirmed with the buyer before they take effect.

  1. Step 1

    Ask the export desk

    In writing. Send the change to the export desk (Export Sales Manager, Irfan Maulana) and name the order it belongs to. Messages are answered within 15 minutes during working hours (WIB), or the next working day outside them.

    Contact the export desk

  2. Step 2

    The factory confirms

    What the change means. The factory tells you what the change touches at the stage your order has reached: the printing, the production run, the weathering period or the loading date.

  3. Step 3

    The change is recorded

    On a revised proforma invoice. The change takes effect once both sides have confirmed it and it is written on a revised proforma invoice. A message alone does not change the order.

Important

Bank details do not change by message

The bank account on the proforma invoice is never changed in a chat or an email. The check to make before any payment is on the payment terms page: the bank-name rule.

3. What a change touches, by kind of change

What a change costs in time depends on which stage of the order it reaches back into.

What each kind of change to a container order of coconut shell charcoal briquettes touches after the deposit, with the confirmed factory fact behind it; durations as confirmed by the factory, November 2026.
What changesWhat it touchesThe fact behind it
Artwork or carton marks The print run, which counts from approved artworkPrinting takes 2 weeks for a new design and about 2 weeks for an existing one
Shape, size or grade Production, and the weathering period that follows itProduction takes 21 days for a 20 ft container, then 14 days of weathering
Quantity, or the mix of variants The minimum per variant and the one-container minimum2 t per shape, size and packaging variant; 1 ocean container per order
The loading date The production slot and the closuresProduction slots go to orders in the order they are confirmed; the factory closes on national public holidays and collective leave (cuti bersama)
Consignee or notify-party details The documents issued in those namesThe bill of lading and the other shipping documents carry the names you give

A new shape, size or grade means new product, and new product needs its own weathering period before it is packed. The weathering period is a condition of carriage, so it cannot be shortened to hold a date.

Note

Weathering before packing

Special provision 978 sets carriage conditions for UN 1361 charcoal; it is not an exemption. Unless the competent authority approves otherwise, the material is weathered under cover for at least 14 days before packing (or steam-treated and packed under inert gas), packed at no more than 40 °C, and stowed with at least 30 cm of headspace, and the dangerous goods document states the production date, packing date and packing temperature.

The last moment for each kind of change, and any cost, are not published. The export desk states both when it confirms the change, against the lead time of your order.

4. Cancellations

A canceled order gets its deposit back, less what the factory has already spent on it.

If the buyer cancels, the deposit is returned less the cost of printed packaging and raw material already bought for the order.

The deposit that rule refers to is the one on the proforma invoice: on a first order, a 50% deposit, with the balance before stuffing; for a repeat buyer, a 10% deposit, with the balance after arrival. The payment page sets out the deposit terms the policy refers to.

Note

Ask for the stage in writing

Which costs count at each stage of an order is not published. Before you pay the deposit, ask the export desk to state in writing what is deducted if the order is canceled before printing, during production and after packing.

5. If the factory needs a change

The rule runs in both directions: a change on the factory's side is also confirmed with the buyer before it takes effect.

A change of that kind shows first in the regular updates: after the deposit the factory sends weekly updates on production, packaging, QC and stuffing, by WhatsApp every Monday. What those updates cover is set out on the after-the-deposit page, and a new date can be checked against the order calendar.

A problem found after arrival is handled as a claim: 7 days for quantity and 14 days for quality, counted from arrival of the container at the buyer's warehouse. How facts and regulatory statements on this page are sourced is set out in the editorial and review policy.

Questions buyers ask

Can I change the artwork after I have approved it?
Ask the export desk before printing starts. A change after the deposit takes effect only once it is confirmed with you. Printing runs from approved artwork, 2 weeks for a new design, so artwork approved again later moves the printing later, and the loading date may move with it.
Can I move the loading date after the deposit?
You can ask; the new date takes effect once the factory has confirmed it with you. Production slots go to orders in the order they are confirmed, and the factory closes on national public holidays and collective leave, so a later date depends on the slots that are open when you ask.
Can I change a format or a quantity inside the same container?
A format inside the same container can still change once the change is confirmed with you and recorded on a revised proforma invoice. Each variant still has to meet the minimum of 2 t per shape, size and packaging variant, and the order remains one full container. Whether the change is still possible at your order's stage is the export desk's answer.
Is the deposit refunded if I cancel the order?
Yes, less the costs already incurred. If a buyer cancels, the deposit is returned less the cost of printed packaging and raw material already bought for the order. Which costs have been incurred depends on the stage the order has reached, so ask the export desk to state them in writing before you decide.

Sources

  1. Resolution MSC.556(108): Amendments to the IMDG Code, special provision 978 and 5.4.1.5.18 (opens in new tab), International Maritime Organization (IMO) — accessed

Spotted an error?

Report it — corrections are dated on this page.