Skip to content
PT SCBI

Guide · How to order

After the Deposit: The Weekly Updates on a Shisha Charcoal Order, Stage by Stage

This guide belongs to the ordering section and is written for a buyer between the deposit and the loading of a container order of shisha charcoal, the hookah charcoal or hookah coals of US and Canadian buyers. It sets out what the factory sends, what each stage looks like and what the order needs from you. The rule is one update every week.

Written by
Henry Sinaga
Reviewed by
Dimas Setyawan,
Updated
Reading time
5 min read
Charcoal briquettes are formed by pressing milled charcoal with a binder and drying the pressed pieces before packing.

Quick answer

What will I hear from the factory between the deposit and loading, and when?

After the deposit, the factory sends a weekly update on production, packaging, QC and stuffing, so a missed week is a reason to ask. Each update says which stage the shisha charcoal order has reached; the weathering period before packing is quiet by design. Four points wait on you: approved artwork, an inspection date, the balance and the consignee details.

1. What order communication is

Between the deposit and loading, the factory reports on the order once a week.

Definition

order communication

Order communication is the set of scheduled messages a factory sends a buyer between the deposit and the loading of a container order, saying which stage the order has reached, what was checked, and what the buyer has to decide or send next.

After the deposit the factory sends weekly updates on production, packaging, QC and stuffing, by WhatsApp every Monday. Questions between updates go to the export desk, Export Sales Manager, Irfan Maulana, and are answered within 15 minutes during working hours (WIB), or the next working day outside them.

The channels are on the contact page. The stage each update refers to is fixed by the proforma invoice, which states what was ordered and when it loads.

2. The weekly update, stage by stage

Each update is about the stage the order has reached, and one stage is quiet on purpose.

The stages of a container order of coconut shell charcoal briquettes between deposit and loading, what the weekly update covers at each, and how long each takes, as confirmed by the factory in November 2026.
StageWhat happens at the factoryWhat the update is aboutHow long
Production The briquettes are pressed and driedProduction21 days for a 20 ft container, 21–25 days for a 40 ft
Weathering The briquettes rest under cover in the open air, after production and before packingThe quiet stage: nothing visibly moves14 days
Packaging Boxes are printed from approved artwork; the product is packed by the in-house team, who check every piece by handPackagingPrinting: 2 weeks for a new design, about 2 weeks for an existing one
QC Each batch is checked; a batch fails on smell or smoke on warming up, high ash, cracks or breakage and inconsistent size or densityQCNo set duration
Stuffing The container is loaded with 30 cm of headspace and the charcoal is packed at 40 °C or lessStuffingNo set duration
Coconut shell charcoal briquettes rest under cover between production and packing; during the weathering period nothing is pressed, printed or packed.

The quiet stage is the weathering period. Nothing is pressed, printed or packed during those days, and the period cannot be shortened, because it is a condition of carriage.

Note

Why the weathering days are fixed

Special provision 978 sets carriage conditions for UN 1361 charcoal; it is not an exemption. Unless the competent authority approves otherwise, the material is weathered under cover for at least 14 days before packing (or steam-treated and packed under inert gas), packed at no more than 40 °C, and stowed with at least 30 cm of headspace, and the dangerous goods document states the production date, packing date and packing temperature.

From packing to on board the factory plans 14 days. The stage log behind each lead time is on the lead-times page.

3. Where the order waits on you

At four points the next stage cannot start until the buyer has done something.

  1. Step 1

    Approved artwork

    Printing counts from it. Printing takes 2 weeks for a new design and about 2 weeks for an existing one, counted from the artwork you approve. Artwork approved late is printed late.

  2. Step 2

    An inspection date

    Before shipment. Buyers' third-party inspectors are welcome before shipment; the factory pays for the pre-shipment inspection. Give the export desk the date early enough to fit it between packing and stuffing.

  3. Step 3

    The balance

    On the agreed point. A first order is paid with a 50% deposit, with the balance before stuffing; a repeat buyer pays a 10% deposit, with the balance after arrival. The container is stuffed once the balance is where the proforma invoice says it must be.

    Payment terms and the proforma invoice

  4. Step 4

    Consignee and notify-party details

    For the documents. The bill of lading and the certificate of origin are issued in the names you give, so send them before the container is stuffed.

    What we need from you at each step

A change at any of these points follows one rule: changes after the deposit are confirmed with the buyer before they take effect. What each kind of change touches is on the changes and cancellations page.

4. Stuffing day: the record, the survey and the documents

Stuffing day produces a record, a survey and the first documents of the shipment.

For each container the factory records the date of production, date of packing and temperature on the day of packing. Before shipment, an independent surveyor inspects the load before shipment; the factory pays, inside the FOB price.

At stuffing, headspace is left above the cartons, and the packing date and packing temperature are recorded for the dangerous goods document of the container.

The documents that follow are the vanning certificate, weathering certificate and dangerous goods declaration. When each one reaches you is set out in the document timeline inside those updates, and what each is for is in the export document pack.

The stuffing page explains how a container is stuffed and recorded, including container stuffing itself, and the published records are on the stuffing and weathering records page. How facts and regulatory statements on this page are sourced is set out in the editorial and review policy.

5. If an update does not arrive

A week without an update is a reason to ask the same day, not to wait for the next one.

Write to the export desk, Export Sales Manager, Irfan Maulana; messages are answered within 15 minutes during working hours (WIB), or the next working day outside them. The channels are on the contact page.

A quiet office can have a plain reason: the factory closes on national public holidays and collective leave (cuti bersama). The dates are on the holidays and production calendar.

Tip

Two ways to look for yourself

  • Live video audits and factory visits are welcome: ask for a live call against the stage your order has reached.
  • Buyers' third-party inspectors are welcome before shipment; the factory pays for the pre-shipment inspection.
  • Both are part of factory verification, set out on the verification page.

Questions buyers ask

How often will I hear from the factory after the deposit?
Every week. After the deposit the factory sends weekly updates on production, packaging, QC and stuffing, by WhatsApp every Monday, and the export desk answers questions in between. The weathering period before packing is a quiet stage by design, but it still has its update. A week with no message is a reason to ask the same day.
Can I see my own order while it is in production?
Yes, on request. Live video audits and factory visits are welcome, and your own inspector can check the goods before shipment, at the factory's cost. Ask the export desk to book a video call or an inspection date against the stage your order has reached, so you see the pressing line, the weathering yard or the packed cartons.
What should I do if a weekly update shows a delay?
Ask the export desk for the new loading date in writing. A change after the deposit takes effect only once it is confirmed with you, so a moved date is agreed, not announced. If the date matters for a season, check it against the order calendar before you accept it.

Sources

  1. Resolution MSC.556(108): Amendments to the IMDG Code, special provision 978 and 5.4.1.5.18 (opens in new tab), International Maritime Organization (IMO) — accessed

Plan your next container

Send market, container size and target arrival date — we reply with the loading date and the order-by deadline.