Quick answer
Which in-line checks does a batch pass, and what makes a batch fail?
A batch fails for smell or smoke on warming up, high ash, cracks or breakage, or inconsistent size or density. Before that, incoming shell charcoal is checked against intake limits and each batch of shisha charcoal must reach the oven moisture limit; at packing, the in-house team checks every piece by hand. Results go to the registers linked from the quality hub, which show rows once confirmed.
1. What a quality checkpoint is
A quality checkpoint is a check the factory runs itself, at a fixed point in the line.
Definition
quality checkpoint
A quality checkpoint is a fixed point in production where a batch is checked against a stated criterion and is released, held or rejected before it moves to the next station.
In-line checks are not laboratory results. A certificate of analysis reports laboratory values for a batch, and those belong to the batch COA register on the batch COA register page.
How facts on this page are confirmed is set out in the editorial and review policy.
2. The checkpoints, from intake to packing
Six checks are on file, from the delivery of shell charcoal to the packed carton.
| Checkpoint | What is checked | Criterion on file | Record |
|---|---|---|---|
| Intake | Incoming shell charcoal | Moisture below 12%, fixed carbon 82% or more and volatile matter 14% or less; ash content and ash color checked, with no numeric limit on file | None published |
| Size | The dimensions of the pieces | Stated tolerance ±0.3 mm per side; measured with a digital caliper on 20 pieces, 4 times a day, and written down | The size-deviation log |
| Oven | Moisture when the batch leaves the oven | Moisture of 2% at most, measured with a moisture meter on every oven load | The batch COA register, moisture column |
| Packing day | The temperature of the charcoal | Recorded; 40 °C at most | The stuffing and weathering records |
| Burn test | Pieces burned on the bench | 3 pieces on an electric coil; time to light and burn time written down | None published |
| Drop test | The strength of lit pieces | 350 per oven load, tested as lit pieces, after 10 minutes of heating and 5 minutes on a shisha bowl; dropped from 100 cm for cubes and 30 cm for hexagonal, dome and finger pieces onto a hard tiled floor; a piece passes when it does not break in at least 3 drops | The drop-strength log |
| Packing | Every piece | Packed by the in-house team, who check every piece by hand | None published |
| Every batch | A retained sample | A sample of every batch, about 25 kg of each batch, kept for 5 years | The retained-sample log |
The size criterion is the stated size tolerance. The stations behind each row are on the production process page.
3. What fails a batch
Four criteria fail a batch, and the factory names all four.
- Smell or smoke on warming up
- High ash
- Cracks or breakage
- Inconsistent size or density
Where in the line each criterion is applied, how the warm-up check is run and what happens to a failed batch are not on file, so this page does not describe them.
4. Where the results are published
Each result has a register, and the registers are gathered in one place.
The quality hub shows where each checkpoint result is published, as quality data and published records:
- The batch COA register: confirmed rows published.
- The size-deviation log: first rows being collected.
- The drop-strength log: first rows being collected.
- The stuffing and weathering records: first rows being collected.
- The retained-sample log: first rows being collected.
The physical record behind them is the retained sample: a sample of every batch, about 25 kg of each batch, kept for 5 years.
5. What is not on file yet
Five details of the checks are not on file yet, and they are left out here.
- The sampling rate for each check.
- The measuring tools.
- Who releases a batch.
- The flow for a batch that is held or rejected.
- Whether results are kept per batch or per shift.
Tip
Ask, or send an inspector
Live video audits and factory visits are welcome. Buyers' third-party inspectors are welcome before shipment; the factory pays for the pre-shipment inspection. Both routes are on the verification page.
After the checks, the briquettes go to packing and loading.