Skip to content
PT SCBI

Record · How to order

Shisha Charcoal Lead Times: Deposit to Loading, Stage by Stage, With the Log of Past Containers

This page belongs to the ordering section and sets out how long a container of shisha charcoal, the hookah charcoal or hookah coals of US and Canadian buyers, takes from deposit to loading on board. It is written for the buyer who plans when to order for a season. It gives the planning figures by stage and the dated log of past containers.

Written by
Henry Sinaga
Reviewed by
Dimas Setyawan,
Updated
Reading time
4 min read

Quick answer

How long does a container of shisha charcoal take from deposit to loading on board?

Lead time runs from deposit to loading on board, includes the weathering window the carriage rules require, and the log shows each past container's dates. For these coconut shell charcoal briquettes the planning figures on file are 21 days of production for a 20 ft container, 14 days of weathering and 14 days from packing to on board.

Lead-time log: 1 confirmed record from 2026-10-06 to 2026-10-06. Per container order, from deposit to loading.
Date OrderContainerDeposit to production start (days)Production (days)Production finished to packing (days)Packing to on board (days)Deposit to on board (days)Loading port
Sep 2026 order (number masked)1 × 20 ft3817735Semarang

Method: Dates from the order file of each container: deposit received, production start, production finished, packing and loading on board; one row per container, with the buyer and the order number masked.

Last updated 2026-10-06 · re-checked at least every 90 days · next due by 2027-01-04.

1. What the lead time counts

The lead time counts the days from the deposit received to the container loaded on board at the port of loading.

Definition

lead time

Lead time is the number of days from the deposit on a container order to loading on board, made up of production, drying, weathering before packing, and packing with documents.

It does not count the quotation, the sample or the ocean transit. The days at sea are recorded voyage by voyage on the transit times page, and a container order starts its count when the deposit arrives.

How facts on this page are confirmed is set out in the editorial and review policy.

2. Lead time by stage

The factory plans a container in three stages after the deposit: production, weathering and packing to loading.

Planning figures on file for one container of coconut shell charcoal briquettes, by stage, as confirmed by the owner in November 2026; the log on this page shows what past containers took.
StagePlanning figure
Production, 20 ft container 21 days
Production, 40 ft container 21–25 days
Weathering before packing 14 days
Packing to loading on board 14 days

The weathering stage cannot be shortened, because weathering before packing is a carriage condition for charcoal at sea; the days are recorded for each container.

Special provision 978 sets carriage conditions for UN 1361 charcoal; it is not an exemption. Unless the competent authority approves otherwise, the material is weathered under cover for at least 14 days before packing (or steam-treated and packed under inert gas), packed at no more than 40 °C, and stowed with at least 30 cm of headspace, and the dangerous goods document states the production date, packing date and packing temperature.

Source: Resolution MSC.556(108): Amendments to the IMDG Code, special provision 978 and 5.4.1.5.18 (opens in new tab), International Maritime Organization (IMO), accessed

4. The log of past containers

The log sits at the top of this page, one row per container, with the days of each stage taken from the order file.

The newest row (1 × 20 ft, loaded at Semarang) took 35 days from deposit to on board: 3 days to the start of production, 8 days of production, 17 days from the end of production to packing and 7 days from packing to on board.

The planning figures are the factory's working estimates for a new order; the log shows what each past container took. Read the two together: a figure in the plan and a row in the log are not the same thing.

5. What moves a lead time

A lead time moves with the artwork, the calendar and the space on the ship; the weathering window never shortens.

Note

What can move the loading date

  • Artwork approval. On a printed order, a late approval moves the boxes and so the packing.
  • Closures. The factory stops for Idul Fitri (Lebaran) and national public holidays; the dates are on the holiday and production calendar.
  • Peak seasons. Production slots go to orders in the order they are confirmed.
  • Space on the ship. On record, one booking was declined, by Maersk in July 2026, because the sailing had no dangerous goods space; it was rebooked on ONE 6 days later.

Why the weathering days sit inside every lead time is shown container by container in why 14 weathering days are inside every lead time, and the dates to order by for each market and season are on the order-by dates these lead times produce.

Questions buyers ask

Why is the weathering window inside every lead time?
Because charcoal ships by sea as UN 1361, and special provision 978 sets weathering before packing unless the competent authority approves otherwise. The factory weathers for 14 days, and the days are recorded for each container.
Does the lead time include ocean transit?
No. It ends when the container is loaded on board. Transit to your port is recorded voyage by voyage on the transit times page.

Sources

  1. Resolution MSC.556(108): Amendments to the IMDG Code, special provision 978 and 5.4.1.5.18 (opens in new tab), International Maritime Organization (IMO) — accessed

Use the data before you order

Request a sample from current production and compare it with the latest rows.