Quick answer
How long do containers of this factory's shisha charcoal take from loading on board to arrival, lane by lane?
Each row is one voyage, on board to arrival: 36 days Semarang–Umm Qasr via Jebel Ali, 42 days Semarang–Beirut via Port Klang. Each voyage of these coconut shell charcoal briquettes is dated from the on-board date to the arrival at the port of discharge, so a lane's time is read from containers that sailed, not from a schedule.
| Date | Lane | Port of loading | Port of discharge | Via | On board | Arrival | Transit (days) | Carrier |
|---|---|---|---|---|---|---|---|---|
| Semarang–Beirut | Semarang | Beirut | Port Klang | 2026-10-03 | 2026-11-14 | 42 | CMA CGM | |
| Semarang–Umm Qasr | Semarang | Umm Qasr | Jebel Ali | 2026-09-20 | 2026-10-26 | 36 | MSC |
Method: Shipped-on-board and arrival dates of each container, as recorded by the factory, with the transshipment port; transit days run from on board to arrival.
Last updated 2026-10-03 · re-checked at least every 90 days · next due by 2027-01-01.
1. What a row in this record is
One row is one voyage: the lane, the on-board date, the arrival, the transshipment port, the carrier and the days between.
Definition
transit time
Transit time, for a sea container, is the number of days from the date the container is loaded on board at the port of loading to its arrival at the port of discharge, including any transshipment on the way.
The factory loads its containers at Semarang, Surabaya and Jakarta. Each row is recorded by the factory for one of its own containers, with the container number masked, like the other published records.
How facts on this page are confirmed is set out in the editorial and review policy.
2. The record
The record sits at the top of this page, newest voyage first, with the method it is kept by and the date it was last checked.
- Lane and ports. The port of loading and the port of discharge.
- Via. The port where the container changed vessel, if it did.
- On board, arrival and transit. The two dates and the days between them.
- Carrier. The shipping line that carried the container.
Two voyages are recorded so far: Semarang to Beirut in 42 days, transshipped at Port Klang; and Semarang to Umm Qasr in 36 days, transshipped at Jebel Ali.
3. Reading a transit time
A transit time on this page is a voyage that happened, not a schedule or a promise.
Each row names its transshipment port, because a change of vessel on the way is part of the time. Under FOB your forwarder books the vessel, and the carrier sets the routing of each sailing, so the next container on a lane can sail by another route.
Each market page shows the rows that name its own port, beside its formats and documents: your market's lane page. The bookings behind the voyages, with each line's answer, are in the carrier acceptance log.
4. Planning an arrival
An arrival date is planned in three parts: the lead time to on board, the transit of your lane and a buffer.
-
Step 1
Start from the lead time
Deposit to on board. Take the days from the deposit to loading on board from the lead times page, for your container size and season.
-
Step 2
Add the transit of your lane
From the rows. Add the days of the voyages on your lane from this record, read as voyages that happened, with their transshipment port.
-
Step 3
Keep a buffer
For the sea. Carrier schedules, transshipment and port congestion change the outcome, so plan the arrival with days in hand rather than on the shortest row.
The lead time is set out stage by stage on the lead times page, and the order calendar turns lead time and transit into dates by market and season: the order-by dates these transits feed.