Quick answer
What do I need to budget, in money and in weeks, for a first container under my own brand?
A first branded container is budgeted as net tons times the dated price per ton, with plate cost included and a 50% deposit. The balance is paid before stuffing, so the FOB value of the coconut shell charcoal briquettes is paid before the container leaves. A new design prints in 2 weeks from approved artwork. Freight, insurance, duties and destination costs are lines the buyer adds.
1. What the budget covers
The budget runs from the first sample to the container loaded on board, and it has six lines.
Definition
brand launch budget
A brand launch budget, for a private-label shisha charcoal brand, is the list of costs and dates between the first sample and the first branded container: the container itself, the branding setup, the deposit and balance, and the costs the buyer adds after loading.
| Line | Basis | Who states it |
|---|---|---|
| The container | Net metric tons × the dated price per ton | The factory, on a dated list and then on the proforma invoice |
| Printing plates | Included in the price list | The factory |
| Artwork | The buyer's own cost | The buyer or the buyer's designer |
| Samples | Free samples of 1–10 kg; the buyer pays the courier (DHL or EMS) | The courier, for the parcel |
| A mold, only for a custom shape | USD 300–500, paid by the buyer | The factory |
| Freight, insurance, destination charges, duties and taxes | Not priced on this site | Your forwarder and your customs broker |
The scope is FOB: the page stops when the container is on board. The FOB price includes all local charges, trucking to the port, terminal handling charges (THC), vanning (container stuffing) and a thermal blanket. It gives no margin, no resale price and no landed cost.
2. The container line
The container is the largest line, and it is one multiplication: net metric tons times the dated price per ton for the grade and the packaging tier.
| Container | Net metric tons | Container line, lowest to highest grade |
|---|---|---|
| 20 ft, 25 mm cubes | 20 | USD 34,000 (Premium) to USD 36,000 (Platinum) |
| 40 ft, 25 mm cubes | 26.5 | USD 45,050 (Premium) to USD 47,700 (Platinum) |
The line-by-line ledger for a 20 ft and a 40 ft container is on the cost page: the container ledger the budget starts from, under container cost. The FOB price for each grade is on the pricing page, and the minimum order is one container.
3. Branding lines
Branding adds no fee of its own to the container line; it adds a planning rule and two costs the buyer prices.
- Plates. The plate cost is included in the price list.
- The minimum per design. It is 2 t per shape, size and packaging variant, so each design in a range has to reach it inside the container.
- A mold. Only a custom briquette shape needs one: USD 300–500, paid by the buyer.
- Artwork and the sample courier. Both are the buyer's own costs: Free samples of 1–10 kg; the buyer pays the courier (DHL or EMS).
What the boxed tier of the price list contains, and the difference to bulk packing, is worked out under private-label cost on the private-label cost page.
4. When the money moves
On a first order all of the money for the goods moves before the container does.
-
Step 1
The quote
Dated and short-lived. A quote is valid for 5 working days, so the price in the budget has a date on it.
-
Step 2
The deposit and the balance
Both before loading. A first order is paid with a 50% deposit, with the balance before stuffing. The whole FOB value is therefore paid before the container leaves the factory.
-
Step 3
Later orders
The terms change. A repeat buyer pays a 10% deposit, with the balance after arrival, so the second container ties up less cash than the first.
The terms and the bank-name check are on the page for the proforma invoice; no bank detail is repeated here.
5. The calendar
The calendar is a list of stages with their durations, not a total.
| Stage | Duration | Counted from |
|---|---|---|
| Sample dispatch | The next working day | Your sample request |
| Printing a new design | 2 weeks | Approved artwork |
| Production | 21 days for a 20 ft; 21–25 days for a 40 ft | As stated on the proforma invoice |
| Weathering | 14 days | The end of production, before packing |
| Packing to on board | 14 days | Packing |
Ocean transit is outside the table and is not stated on this page. The order of the steps is on the first-container page, the first-container sequence step by step, and each lead time is logged on the lead-times page. A shisha charcoal sample comes before all of it.
6. Lines you add yourself
Everything after loading is the buyer's to add, and each line has someone who quotes it.
- Ocean freight and insurance: your freight forwarder.
- Destination terminal and handling charges: your forwarder or its agent.
- Customs clearance, duties and taxes: your customs broker.
- Inland delivery and storage: your carrier and warehouse.
- Your own launch costs: yours alone.
Note
No figure for these lines
No amount appears for any of these lines on this site, for any market, and no margin is stated. What the factory supplies for your import clearance is on the destination requirements page.
How prices and facts on this page are confirmed is set out in the editorial and review policy.